How Long Does It Take to Move House?

By in
112
How Long Does It Take to Move House?

The move itself usually takes one day. For most homes, loading, a local drive and unloading add up to somewhere between two and ten hours, depending on the size of the property and how easy it is to get in and out. The legal side of buying and selling runs on a different clock entirely: GOV.UK puts it at about five months on average.

This guide covers the physical move, which is the part we handle, with a short section near the end on the legal timeline and when to book your crew around it.

Moving house runs on three different clocks

When people ask how long moving house takes, they can mean three quite different things. Keeping them apart makes the answer much clearer.

What you are timingTypical length
PackingA day for smaller homes and two to three days for larger ones with professional packers. Weeks, if you pack yourself.
The move itself (loading, driving, unloading)Usually one day
The property transactionAbout five months on average, longer in a chain

Most of the stress in a move comes from mixing these up, for example expecting to be settled in by lunchtime on a day when the keys have not yet been released.

How long does a house removal take by property size?

Here are typical figures for a local move. They cover loading, a short drive and unloading, and they leave out packing and any wait for keys.

PropertyTypical crewTypical moving day
1 bed flat22 to 3 hours
2 bed23 to 5 hours
3 bed34 to 6 hours
4 bed4 to 55 to 7 hours
5 bed or larger5 to 6+6 to 8 hours

These are averages, not a promise for any individual job. Two houses of the same size can take very different amounts of time, and the crew size and estimate for your move are usually worked out at the removal survey. A professional house removals team will also plan around how much you own, not just how many bedrooms you have.

Professional packing typically adds 1-3 days depending on house size, and usually weeks if DIY packing.

What adds hours to a move in Hertfordshire and Essex

The same house can take noticeably longer or shorter depending on where it is and how the van can reach it. These are the factors we see most often across the two counties:

  • Period properties. Narrow staircases, low lintels and tight hallways are common in market towns. Larger furniture sometimes has to be taken apart to get out, then rebuilt at the other end, which adds time at both addresses.
  • New build estates. Roads on newer developments are often privately managed and narrower than they look. One parked car can stop a large vehicle, which means a longer carry from van to door.
  • Rural lanes. Some properties have nowhere to turn a large van, so a smaller vehicle may be the right choice, and that can mean extra trips.
  • Controlled parking. If the van cannot park close, every item travels further. A council parking dispensation may be needed, and it usually has to be arranged several working days ahead.
  • Lofts, garages and sheds. These are the most common source of a move being bigger than expected, because people stop noticing what is in them.

We cover the local quirks in more detail in our guide to moving locally in Hertfordshire and Essex.

A recent three bedroom move from a Victorian terrace looked like a six hour job on paper. Two wardrobes would not clear the turn at the top of the stairs, so they had to be taken apart and rebuilt at the other end, and the van could only park three doors down because of the controlled parking zone. Between them, those two things added a little over an hour. Had we known about the staircase and the parking at survey stage, we would have planned the extra pair of hands and arranged the dispensation in advance, and the day would have stayed on schedule.

How long does it take to pack a house?

Packing is the part of a move that people most often underestimate. With a professional packing service, packing usually takes a single day for a smaller home and two to three days for a larger one. If you are packing yourself, plan in terms of weeks, not days, with most of the work happening in the last two to three weeks. Our packing checklist and timeline shows when to start each room, and if you are weighing up the options, it is worth reading whether removal companies pack for you.

Whichever route you choose, the last stretch is where time gets lost. The final cupboards, the bathroom, the loft and the garage are the areas most often left until the crew arrives.

On one recent job the house was “nearly all packed” when we arrived, but the loft and the garage had not been touched. Sorting those on the day added most of an extra hour for the whole crew. Customers who finish the small, awkward spaces the evening before almost always see the move run to plan. If there is one thing to leave nothing to chance, it is the loft, the garage and the cupboard under the stairs.

What happens on moving day, step by step

The order is the same on most moves, even though the timings vary:

  1. Walkthrough. The crew leader goes through the property with you, confirms what is going and what is staying, and flags anything fragile or awkward.
  2. Loading. Heavy and bulky furniture goes on first, with lighter boxes layered on top and everything protected for the journey.
  3. The drive. For a local move this is usually the shortest part of the day.
  4. Keys. If you are buying, the keys at the other end are not released until your solicitor confirms that completion has taken place. On busy completion days that is often around or after lunchtime, so the crew may be loaded and waiting.
  5. Unloading. Items go to the rooms you point out, so a quick plan for where the large furniture goes saves time.
  6. Final walkthrough. You and the crew leader check every room before the crew leaves.

If completion runs late, the loaded van is not wasted time. Our guide to what happens when completion is delayed explains how a crew holds, communicates and, if needed, uses secure storage.

Moves over a long distance can run across two days, with an overnight stop before delivery. If that applies to you, it is worth asking about at the survey.

How long does it take to move house once it is sold?

If you are asking about the whole process of buying and selling rather than the removal day, the honest answer is months, not days. GOV.UK says buying a home takes about five months on average, and it can take longer if you are part of a chain. You can read the full picture in GOV.UK’s guide to buying a home.

The part that matters most to your removal crew is the gap between exchange and completion. According to MoneyHelper’s guide to exchange and completion, buyer and seller agree this gap between them, and it is typically between 7 and 28 days. That is one reason it is worth speaking to a removal company early. Our guide to how far in advance to book explains how to do that before the date is fixed.

How to keep moving day shorter

You cannot control the keys or the staircase, but a few things reliably save time:

  • Clear the routes. Hallways, landings and stairs free of loose items let the crew work without stopping. Our guide to preparing your home for moving day goes through it room by room.
  • Separate what is staying. If everything looks like it is going, the crew has to check each item.
  • Sort parking early. Tell us about restrictions when you first get in touch, and arrange any council dispensation in good time.
  • Dismantle ahead if asked. Items that need taking apart are easier to deal with before the day.
  • Decide on packing support early. Doing it in the last few days is where time and stress both pile up.

Frequently asked questions

How long does it take movers to pack a house?

With professional packers, usually a single day for a smaller home and two to three days for a larger one. Access, the number of rooms and how much has already been sorted all affect it.

How long does it take to unload at the new house?

Unloading takes a similar amount of time to loading, sometimes a little less, because the crew knows what is coming off the van. It runs longer if parking is restricted or if the large furniture has to go up several flights of stairs.

What if completion is late in the day, can the move still happen on the same day?

Often yes, but it depends on when the keys are released and how large the move is. If it gets too late to unload safely, the belongings can be held securely and delivered the next day. Tell your removal company as early as you can if completion is in doubt.

What day should you move house, and does it change how long it takes?

The day does not change how long the crew takes to load and unload, but Fridays and the end of the month are the busiest completion days, which raises the chance of a late key release. If your date falls on one of those, book earlier than usual.

Do I need to be at the house all day?

It helps to be there at the start to walk the crew through the property and at the end for the final check. In between, many people find it easier to stay in one room or out of the way while the loading is carried out.

Planning a move in Hertfordshire or Essex?

If you would like a realistic estimate for your own move, tell us about the property, the access and what you need to take, and we will talk you through what to expect.

Get a free, no-obligation quote from Direct Moves

54321
(0 votes. Average 0 of 5)
Leave a reply

Your email address will not be published. Required fields are marked *